Winona Main Channel Bridge
MN-43/WI-54 Mississippi River Crossing At Winona
Winona, Minnesota

Winona Main Channel Bridge

• Structure ID: NBI 5900.
• Location: River Mile 725.8.
• River Elevation: 646 Feet.
• Highway: MN-43, WI-54.
• Daily Traffic Count: 11,400 (2002).
• Bridge Type: Steel Truss Through Deck.
• Length: 2,288 Feet Overall.
• Width: 31 Feet, 2 Lanes.
• Navigation Channel Width: 434 Feet.
• Height Above Water: 64 Feet.
• Date Built: Opened November 21, 1942, Rebuilt 1985.
Winona was once located on a island in the river. The western-most channel has since filled in with silt or has been filled in with debris over the years. The result is that the highway river crossing is about a mile through city streets from the main route of US-14 and US-61. The lack of a direct route diminishes the usefullness of this bridge.

The river crossing here is composed of 3 bridges in all, this main channel structure, the North Channel Bridge, and a short bridge over the rairoad tracks on the Wisconsin side. This is the second highway bridge to stand in this spot, having replaced the 1891 structure. There once was two railroad bridges at Winona, both just downstream from this location.

Update—MN-DOT suddenly closed the Winona Main Channel Bridge on June 3, 2008, after it was discovered that the bridge had similar gusset plate problems as the I-35W and DeSoto Bridges. The gusset plates were only marginal to begin with, and showed extensive damage due to rust. It is not known how long the bridge will be closed, or if it can be repaired. The nearest river crossings are La Crosse and Wabasha.

Update—as of June 14, 2008, the Winona Main Channel Bridge is once again open to car and pickup truck traffic. Inspections were made to the bridge and gusset plates, and a new weight limit was set for the bridge. In addition, a series of repairs are needed. The result is that truck traffic, RVs, and trailers are banned from the bridge. Pedestrian and bicycle traffic is also banned since the sidewalks will be used to stage equipment for the bridge repairs. MN-DOT has scheduled this bridge to be replaced in 2014.

Update—the main repairs are now finished, and the bridge was opened for truck traffic on July 22, 2008, ten days ahead of schedule. At that time, there was still repair work to be completed, but the major structural repairs are complete.

Winona Main Channel Bridge
Winona Main Channel Bridge
Winona Main Channel Bridge
Winona Main Channel Bridge
Winona Main Channel Bridge

Home  Return To Upper Mississippi River Bridges Home Page
Photo and text by John A. Weeks III, Copyright © 2005, all rights reserved.
For further information, contact: john@johnweeks.com